Advanced Manufacturing
Fuse has a deep understanding of clean environments with our advanced manufacturing projects. One of the owners of Fuse, Paul Meyer, has over 37 years of experience in the sector and has completed over 100 cleanroom projects along with other critical environmental facilities. We appreciate the complexity and critical nature of the design and enjoy the interface with the highly technical project managers who lead the projects for the owners/user groups. Fuse has developed a large client base in this area and has several staff members dedicated to the project type.
To learn more about our services, check out our portfolio of past projects or contact us today to get started on your project!
Harder Clean Room and Office | Austin, TX
Harder Mechanical is a mechanical contractor who specializes in the advanced technology sector, as does Fuse. We share many of the same clients, many of whom wish to remain confidential. Harder’s new Austin facility provides fabrication of general mechanical building components as well as specialty process & high purity components for installation at advanced manufacturing facilities. Fuse has vast design experience with these facility types & working with Harder was a natural fit.
Samsung Austin Semiconductor | Austin, TX
Fuse has provided design management and architectural services on an ongoing basis at Samsung Austin Semiconductor's 300-acre North Austin campus since 2014. Including work at previous firms, Fuse leadership has overseen the design of more than $5 billion in campus improvements since 2004.
KoMiCo Technology | Austin, TX
KoMiCo Technology Inc.’s facility is located at the southwest corner of the intersection of I-35 and SH-45. This facility specializes in the coating and cleaning of parts for use within the semiconductor industry. The KoMiCo Expansion is meant to provide additional lab space to allow for increased capacity and productivity, as well as additional office spaces and parts storage.
More Projects
Samsung Austin Semiconductor
- 2015 Capacity Upgrades
- 2015 Safety & Quality Upgrades
- 2016 Capacity Upgrades (Phase 3)
- 2016 Capacity Upgrades (Phases 1 & 2)
- 2016 Safety & Quality Upgrades
- 2017 Expense Projects
- 2017 Safety & Quality Upgrades
- 2017 Site Improvements
- 2018 Capacity Upgrades
- 2018 Safety & Quality Upgrades
- 2019 Capacity Upgrades
- 2019 Capital Projects
- 2019 Safety & Quality Upgrades
- 2020 Capacity Upgrades
- 2021 Capacity Upgrades
- 2021 Gas Infra Tool Installations
- 2022 Capacity Upgrades
- 2023 Capacity Upgrades
- 2024 Security Projects
- Cooling Tower 02 Expansion
- CUB Electrical Room Cooling
- CUB1 Boiler Access Platforms
- CUB1 Restroom Renovation
- CUB1-CUB2 Condenser Water Pump Replacement
- CUB2 Boiler Backup Feedwater Lift Station
- CUB2 Steam Line Vent Support
- Diesel Generator Unification
- Energy Management Audit & Life Cycle Cost Analysis – Programming
- FAB1 2022 Capacity Upgrades – Chem and Spec Gas
- FAB1 Compressor #3 Replacement
- FAB1 D550 – Replace IPA
- FAB1 Heat Gen Capacity Increase – Phase 2
- FAB1 HF(49%) Replacement
- FAB1 N2 Compressor Addition
- FAB1 NBA Replacement
- FAB1 OA and WSS Upgrades
- FAB1 P&ID Updates
- FAB1 PCW Improvements
- FAB1 Scrubber Yard MCC Replacement
- FAB1 Waste Tank Expansion – Phase 1
- FAB1 Waste Tank Expansion – Phase 2
- FAB1-FAB2 Auto Chiller Valves
- FAB1-FAB2 Battery Room Analysis
- FAB1-FAB2 Cafeteria Code Study
- FAB1-FAB2 Chemical Room Expansion Study
- FAB1-FAB2 FFU Monitoring
- FAB1-FAB2 OA & TO Safety Grating
- FAB1-FAB2 RCS System Design
- FAB2 2021 Solvent Waste Storage – Phases 1 & 2
- FAB2 3rd Floor Office Renovation
- FAB2 CT-2X Blowdown
- FAB2 Data Center Expansion
- FAB2 DCS Gas Cabinet Design
- FAB2 GCS Chem Room EMO Panel
- FAB2 GCS Redundancy Projects
- FAB2 H2 Purifier Improvements
- FAB2 H2SO4 ISO Bay Trench Repair
- FAB2 ICPMS – Phase 2
- FAB2 ICPMS – Phase 5
- FAB2 ICPMS Phase 4
- FAB2 LTO520 DTLR
- FAB2 Mechanical Room Expansion
- FAB2 OA VFD Relocation
- FAB2 OMCTS Equipment Relocation
- FAB2 Particle Counter – Phase 3
- FAB2 PVAC Pump Additions
- FAB2 Scrubber Replacement
- FAB2 SiH4 P&ID Creation
- FAB2 South Slurry Expansion
- FAB2 Temp and RH Control Project (IMES Prime)
- FAB2 TO-3 Fan Replacement – 4th Fan Addition
- FAB2 VOC Emission Leakage Elimination
- FAB2 Waste Tank Expansion – AWW Pump Access Platform
- FAB2 Waste Tank Room Expansion
- FAB2 Water Test Lab
- FABX Heat Exchanger Modifications
- FABX Slurry Room Mods
- FOSB Vestibule
- Gate 4 ISO Trailer Staging
- GCS Redundancy Projects
- Hardware Innovation Center
- IPA T-Box Addition
- IWT Temporary Trailer Addition
- IWT2 Filter Press Fall Protection Feasibility Study
- IWT3 SiH4 P&ID Creation
- Nitrogen Plant #9
- OA Unit Sensor Redundancy
- P&ID Updates
- P&ID Updates – NH3
- P&ID Updates – SiH4
- Secondary Substation Dewatering
- Secondary Substation Expansion
- Site 5G Wireless Upgrades
- Site Critical Sump Capacity Upgrades
- Site HVAC I&C Winterization Design
- Site Incoming Utility Improvements
- Site LED Lighting Phase 5
- Site OAC Heating – Phase 1
- Site OAC Heating – Phase 2
- Site Parking Drainage
- Site Stormwater Improvements
- Site Uninterruptable Process Air & AWW Reactor Bypass
- Site Wireless – CUB Areas
- Stormwater Pond Improvements
- UPS Battery Room Fire Protection
- UPW Piping Structure Analysis
- UPW1 HCl Sump Modifications
- Utility Systems Redundancy Improvements
- Wafer Granulator Building Addition
- Wafer Granulator Building Expansion
- Waste Segregation Building
Applied Materials – Austin, Texas
- B30 Cleanroom Conversion
- B30 Level 2 Cleanroom Janitorial Closet
- B30 Level 2 Office Fit-Up
- B30 Manufacturing Support Areas
- B30 Upgrades – Phase 1
- B30 Upgrades – Phase 2
- B31 B32 B33 Breakroom Refresh
- B31 Cleanroom Conversion
- B31 Digital Forensics Lab
- B31 Legal Space Fitup – Phase 1
- B31 Legal Space Fitup – Phase 2
- B31 Level 2 Office Fit-up
- B31 Office Refresh – Mother’s Room Access
- B31 SMG Egress Study
- B32 Café Upgrades
- B32 Cleanroom and Test Bays
- B32 Dock Expansion
- B32 EPG Cleanroom and Test Bays
- B32 GIS HUB
- B32 Office Refresh
- B34 Cleanroom Relocation – Phase 1
- B34 Cleanroom Relocation – Phase 2
- B34 CSMG Airlocks
- B34 Dimension Phase 2 Fit-up
- B34 Pinnacles Design
- B34 Pinnacles – Phase 1
- B34 Pinnacles – Phase 3
- B34 SMG Relocation
- B36 Café Upgrades
- B36 Cleanroom Receiving Area Conversion
- B36 Electrical Room Conversion
- B36 Humidifier Replacements
- B36 Office Refresh
- B37 Fire Protection Upgrades
- B37 Metrology Cleanroom
- B37 Pre-Incident Fire Planning
- B37 Restroom Additions
- B41 Breakroom Upgrades
- B41 EIFS Replacement
- B41 GSOC
- B41 GSP Office Renovation
- B41 Lab Expansion
- B41 Miles Conference Center
- B41 Office Refresh
- B45 Interior Demo & Fit-Up
- B45B Upgrades
- B45C Warehouse Renovation
- Harris Branch Guard Houses (Migl Prime)
- Harris Branch Warehouse
Entegris – Burnet, Texas
- Ampule Area Refurbishment
- Analytical Lab – Phase 2
- Cleanroom Expansion Study
- Fill Hallway Study Hourly
- Maintenance Shop Conversion
- Phase 1 Expansion
- Phase 2 Expansion – Cleanroom and Offices
- Chemical Code & MAQ Analysis
- Office Area Expansion
Sandia National Laboratories
- Semiconductor Fab Building Renovations
KoMiCo Technology
- Phase 1 Building Expansion
- Phase 2 Building Expansion
NXP Semiconductor
- Bulk IPA Expansion
- Cylinder Storage Canopy
- E2 Test Infra Upgrade
- TEM02 Install
More Advanced Manufacturing Projects
- BSA – ICU Medical – Hazard Consulting
- Heraeus New WTS
- Ultraclean Code Analysis
- Harder Mechanical – Fabrication Shop & High Purity Cleanroom
- Infineon Expansion
- Melissa Light Industrial Development – Melissa, Texas
- UT Austin Microelectronics Engineering Research Center (Associate Architect with Kirksey as Prime)
- UT Austin EME Hood Replacement and Renovation
- Cerilliant Lab Renovation
![FUSE LOGO - WHITE ON BLACK BACKGROUND SQ_Vector_Actual 4 [Vectorized] (1) (1)](https://www.fuse-arch.com/wp-content/uploads/2026/06/FUSE-LOGO-WHITE-ON-BLACK-BACKGROUND-SQ_Vector_Actual-4-Vectorized-1-1.png)